Improvements!
Okay, not home improvements, but Kona improvements. The one problem we had was trying to get Kona to go into his crate and sleep at night. In the past week, we pretty much had to calm him down and pick him up and place him in the crate. Now for the past few days he's been going in there himself!
It pretty much started when I picked him up and placed him inside. I kept the door open and just let him lay there, pet him, and comfort him with "Good Kona, you're such a good boy Kona" and the like (plus feeding him treats helped too). He eventually fell asleep and I just left it open for him. He slept for about 15 mins and got out. Since then, he pretty much goes inside himself and sleeps! Pretty cool...
Oh and speaking of improvements (home that is), the contractors are not very organized. We had to pick out our vanity (which we did) and they were to order it. They never did it until they were going to install it and lo and behold it was not in stock so we had to wait a few weeks. Now the same goes for out flooring. I informed them a month ago what we wanted and again they just went to pick it up and again, it had to be ordered! Getting a little cheezed with everything!
But on the other hand, I have done most of the insulation and still working on the vapour barrier, then it is good to go with the drywalling.
Anyways, guess I should get bakc to work!
Wackie
It pretty much started when I picked him up and placed him inside. I kept the door open and just let him lay there, pet him, and comfort him with "Good Kona, you're such a good boy Kona" and the like (plus feeding him treats helped too). He eventually fell asleep and I just left it open for him. He slept for about 15 mins and got out. Since then, he pretty much goes inside himself and sleeps! Pretty cool...
Oh and speaking of improvements (home that is), the contractors are not very organized. We had to pick out our vanity (which we did) and they were to order it. They never did it until they were going to install it and lo and behold it was not in stock so we had to wait a few weeks. Now the same goes for out flooring. I informed them a month ago what we wanted and again they just went to pick it up and again, it had to be ordered! Getting a little cheezed with everything!
But on the other hand, I have done most of the insulation and still working on the vapour barrier, then it is good to go with the drywalling.
Anyways, guess I should get bakc to work!
Wackie
0 Comments:
Post a Comment
<< Home